DatasheetQ Logo
Electronic component search and free download site. Transistors,MosFET ,Diode,Integrated circuits

MSM54V25632A-10 查看數據表(PDF) - Oki Electric Industry

零件编号
产品描述 (功能)
生产厂家
MSM54V25632A-10
OKI
Oki Electric Industry OKI
MSM54V25632A-10 Datasheet PDF : 67 Pages
1 2 3 4 5 6 7 8 9 10 Next Last
¡ Semiconductor
MSM54V25632A
PIN DESCRIPTION
CLK
CS
CKE
Address
BA (A9)
RAS
CAS
WE
DSF
DQM0 -
DQM3
DQi
Fetches all inputs at the "H" edge.
Disables or enables device operation by asserting or deactivating all inputs except CLK, CKE,
DQM0, DQM1, DQM2 and DQM3.
Masks system clock to deactivate the subsequent CLK operation.
If CKE is deactivated, system clock will be masked so that the subsequent CLK operation is
deactivated. CKE should be asserted at least one cycle prior to a new command.
Row & column multiplexed.
Row address: RA0 – RA8
Column address: CA0 – CA7
Selects bank to be activated during row address latch time and selects bank for precharge and read/
write during column address latch time. A9 = "L" : Bank A, A9 = "H" : Bank B
Functionality depends on the combination. For details, see the function truth table.
DSF is part of the inputs of graphics command of the MSM54V25632A.
If DSF is inactive (Low level), MSM54V25632A operates just like SDRAM.
Masks the read data of two clocks later when DQM0 - DQM3 are set "H" at the "H" edge of the clock signal.
Masks the write data of the same clock when DQM0 - DQM3 are set "H" at the "H" edge of the clock signal.
Data inputs/outputs are multiplexed on the same pin.
*Notes: 1. When CS is set "High" at a clock transition from "Low" to "High", all inputs except CLK, CKE, DQM0,
DQM1, DQM2, and DQM3 are invalid.
2. When issuing an active, read or write command, the bank is selected by A9.
A9
Active, read or write
0
Bank A
1
Bank B
3. The auto precharge function is enabled or disabled by the A8 input when the read or write command is
issued.
A8
A9
Operation
0
0 After the end of burst, bank A holds the active status.
1
0 After the end of burst, bank A is precharged automatically.
0
1 After the end of burst, bank B holds the active status.
1
1 After the end of burst, bank B is precharged automatically.
4. When issuing a precharge command, the bank to be precharged is selected by the A8 and A9 inputs.
A8
A9
Operation
0
0
Bank A is precharged.
0
1
Bank B is precharged.
1
X Both banks A and B are precharged.
4/66

Share Link: 

datasheetq.com  [ Privacy Policy ]Request Datasheet ] [ Contact Us ]