DatasheetQ Logo
Electronic component search and free download site. Transistors,MosFET ,Diode,Integrated circuits

NCP1207AP 查看數據表(PDF) - ON Semiconductor

零件编号
产品描述 (功能)
生产厂家
NCP1207AP Datasheet PDF : 17 Pages
1 2 3 4 5 6 7 8 9 10 Next Last
NCP1207A, NCP1207B
An optocoupler is generally used to transfer the feedback
information to the FB pin while providing the necessary
isolation. It introduces a limitation in how low the skip level
can be adjusted since an optocoupler cannot pull the FB
voltage below its Vce(sat), which is usually around 150 mV.
Therefore, in order to take into account temperature and
process variations, it is not recommended to set up the skip
level below 250 mV, which corresponds to a minimum
resistor Rskip of 420 W. The 150 mV is a much lower level
than what will usually be used (it sets the peak current when
entering skip mode at 5% of the maximum peak current).
If anyway a lower skip threshold is needed, care must be
taken to select an optocoupler with a Vce(sat) guaranteed to
be below the chosen skip level with enough margin.
Demagnetization Detection
The core reset detection is done by monitoring the voltage
activity on the auxiliary winding. This voltage features a
FLYBACK polarity. The typical detection level is fixed at
50ĂmV as exemplified by Figure 17.
7.0
5.0
POSSIBLE
RE-STARTS
3.0
1.0
0V
-1.0
50 mV
Figure 17. Core reset detection is done through a
dedicated auxiliary winding monitoring
TO INTERNAL
COMPARATOR
Rint
Resd
2
ESD2
1
1
ESD1
Rdem
5
4
Aux
Resd + Rint = 28 k
4
3
Figure 18. Internal Pad Implementation
An internal timer prevents any re-start within 8.0 ms
(NCP1207A) or 4.5 ms (NCP1207B) further to the driver
going-low transition. This prevents the switching frequency
to exceed (1 / (TON + 8.0 ms)) or (1 / (TON + 4.5 ms)) but also
avoid false leakage inductance tripping at turn-off. In some
cases, the leakage inductance kick is so energetic, that a slight
filtering is necessary.
The NCP1207A/B demagnetization detection pad features
a specific component arrangement as detailed by Figure 18.
In this picture, the zener diodes network protect the IC against
any potential ESD discharge that could appear on the pins.
The first ESD diode connected to the pad, exhibits a parasitic
capacitance. When this parasitic capacitance (10ĂpF
typically) is combined with Rdem, a re-start delay is created
and the possibility to switch right in the drain-source wave
exists. This guarantees QR operation with all the associated
benefits (low EMI, no turn-on losses etc.). Rdem should be
calculated to limit the maximum current flowing through
pin 1 to less than +3 mA/-2 mA. If during turn-on, the
auxiliary winding delivers 30 V (at the highest line level),
then the minimum Rdem value is defined by: (30 V + 0.7 V)
/ 2ĂmA = 14.6 kW. This value will be further increased to
introduce a re-start delay and also a slight filtering in case of
high leakage energy.
Figure 19 portrays a typical VDS shot at nominal output
power.
400
300
200
100
0
Figure 19. The NCP1207A Operates in
Borderline / Critical Operation
Overvoltage Protection
The overvoltage protection works by sampling the plateau
voltage 4.5 ms (NCP1207A) or 1.5 ms (NCP1207B)after the
turn-off sequence. This delay guarantees a clean plateau,
providing that the leakage inductance ringing has been fully
damped. If this would not be the case, the designer should
install a small RC damper across the transformer primary
inductance connections. Figure 20 shows where the
sampling occurs on the auxiliary winding.
http://onsemi.com
10

Share Link: 

datasheetq.com  [ Privacy Policy ]Request Datasheet ] [ Contact Us ]